This SOC Seagull was assigned to VCS-5 and operated from the heavy cruiser USS Portland (CA-33) during the Battle of Midway in June, 1942. The kit is the 1969 Hasegawa release with decals from Starfighter sheet 72-136.
Construction posts here: https://inchhighguy.wordpress.com/2022/03/18/hasegawa-curtiss-soc-seagull-build-in-1-72-scale-part-i/